CLÁR Funding 2025 Project Expression of Interest for Measure 1: Developing Community Facilities and Amenities
CLÁR (Ceantair Laga Árd-Riachtanais) is a targeted investment programme for rural areas that aims to provide funding for small infrastructural projects in rural areas that have experienced significant levels of de-population.
Rate of Aid
A minimum grant of €5,000 and maximum grant of €65,000 will apply to this measure. To facilitate projects of a slightly greater scale, each local authority can submit 2 applications seeking grant funding of up to €100,000. The scheme will provide up to 90% of the cost. The remaining 10% or balance of the cost must be provided through local authority/community/other resources. Philanthropic contributions will be accepted as full or part of match funding costs.
Please note that match funding cannot come from other DRCD Schemes.
Eligible Projects
Measure 1 will support a variety of capital projects provided that they contribute to the enhancement of existing, and/or the development of new, accessible Community Recreation Facilities.
CLÁR applicants are requested to identify and list in their application the Sustainable Development Goals that are being delivered through their proposed project. This can be up to a maximum of 3 SDGs. Further information on the SDGs can be found by visiting; https://irelandsdg.geohive.ie/
All community amenities funded under this programme must, in so far as practicable, be accessible to all abilities and ages. Any facility funded must be available to the public without a requirement to be a member of a club, enrolled in a school etc. Facilities on school grounds must be open to the public outside school hours and insurance must be in place for the facility at all times. The list below provides an indication of the types of projects that may be supported, but is not exhaustive:
-
Small scale renovation works to community facilities open to the wider community such as community centres/sports centres/clubhouses of sporting groups/youth centres/mens sheds etc
-
Multi-Use Gaming Areas (MUGAs)/Astro-Turf facilities including upgrades
-
Playgrounds/Skateboard parks/Pump tracks/Cycling tracks
-
Walking/Running/Athletics tracks
-
Handball Alleys/Tennis Courts/Basketball Courts/Cricket Grounds
-
Community Gyms/Community Cinemas
-
Sensory Gardens/Community Gardens/Allotments
-
Access to unique local heritage sites/areas of natural beauty
-
Enhanced outdoor toilet and changing facilities
-
Car Parking
-
Improving access at sports grounds e.g. development/upgrade of spectator stands at local sports grounds with a particular focus on improving access for people of all abilities and ages
-
Solar Bins
The application form must clearly outline the need and rationale for the projects put forward.
Ineligible Projects
In the current 2025 scheme, the following projects will not be funded:
-
School/Community Safety Measures
-
Footpaths
-
Road markings
-
Pedestrian crossings
-
Bus shelters
-
Works to current school buildings which are not open to the public after school hours ·
-
CCTV
TERMS AND CONDITIONS
Funding Conditions for Rural Schemes funded under the Department of Rural and Community Development.
All expenditure registered through the Department’s Rural Schemes i.e. Town and Village Renewal Scheme, CLÁR, Outdoor Recreation and Infrastructure Scheme (ORIS) will be subject to the terms of the Public Spending Code
In addition to this, the requirements outlined below will apply to all funding approved through those schemes. The need for adherence to all of the requirements will be reflected in the contractual agreement between the Department of Rural and Community Development and the grantee approved for funding under the scheme.
-
Projects are expected to commence and be completed in line with the timelines set out in the relevant Scheme Outline.
-
Any project that has not commenced by the agreed completion date will automatically be de-committed, unless there has been ongoing engagement with the Department and the reasons for the delay have been accepted by the Department.
-
The Department may de-commit funding allocated to projects under the Scheme where the project is not completed within the time specified, and where the express agreement of the Department to extend the funding arrangement has not been agreed in advance.
-
Phased Payments: Funding may be drawn down in up to 2 phases. The minimum amount that can be drawn down at any time is 50% of project costs once these have incurred. Applicants must provide evidence of payment of contractors prior to requesting drawdown of funding.
-
Projects must be completed in full in order to drawdown the full grant amount. Where it is established that a project has not been completed, the Department may request the grantee to repay any funding received on the project. It is essential that any changes to the project elements, or reallocation of funding between elements, must be advised and agreed with the Department in advance of the change being implemented (Annex 6 – Change of Purpose); the Department will not retrospectively approve changes to projects.
-
Where changes have been applied to an approved project without Departmental approval, the grant funding may be reduced to reflect the amended project.
-
Where retention applies the Department will retain a percentage portion of the grant payment, in line with the percentage cost withheld, until the retention period passes. A conditional extension will be granted in these cases. The remaining grant amount may be drawndown once proof can be provided of the final retention amount being paid over.
-
A cash contribution/match funding as set out in the relevant Scheme Outline is required. The grantee will be required to confirm that the cash contribution is in place at time of application and retain a record of the source of the cash contribution. The Department may request evidence of same during the assessment process.
-
If the project involves works on buildings or lands that are not in the ownership of the grantee, a minimum 15 year lease must be in place unless otherwise agreed with the Department.
-
In the case of funding allocated to enterprises or facilities (i.e. community centre, hubs, vehicles under CLÁR etc.), it is a requirement that they must operate as funded for a minimum of 5 years following release of the final stage of funding, otherwise funding may have to be repaid. Where they do not operate as funded this must be advised and agreed with the Department in advance.
-
All appropriate financial, Public Procurement and accounting rules and regulations must be complied with and each grantee will fully account for the funding received in a timely manner. Any Project with an estimated cost of €50,000 or greater excluding VAT must be advertised on the eTenders platform.
-
If grant recipients are VAT registered the VAT amount is not to be claimed as a project cost at drawdown.
-
Full and accurate documentation to support all expenditure should be maintained and accessible by Department officials for audit purposes at all times and for a period of five years from the date of completion of the project.
-
Grantees will acknowledge the support of Project 2040 / Department of Rural and Community Development/ Government of Ireland, and any other applicable sources of funding (as identified in the relevant Funding Agreement) in all public announcements, advertising and signage, as appropriate, relating to the project. In addition, the Department may seek to use the project in the broader promotion of its policies. Costs for the mandatory signage can be included in project costings at application stage.
-
Signage must be in place at all CLÁR funded projects. These signs must be in a prominent location, of durable quality, acknowledge the CLÁR funding and be of sufficient size to be clearly visible to the public. These signs must follow the Department's Branding Guidelines.
-
Grantees will provide any reports and information relating to the project as may reasonably be requested by the Department of Rural and Community Development from time to time.
-
On-going monitoring and evaluation of the project outputs and outcomes should take place in the context of assessing the impact of the project. Grantees will be expected to collect appropriate data to facilitate this learning on an on-going basis. On request, a brief report (1-2 pages) on the outputs and outcomes of the project funded should be completed and made available to the Department.
-
Each grantee, will provide a contact point/points to the Department to facilitate payment and information requests. The Department should be updated on any changes to contact personnel in a timely manner.
-
The Minister for Rural and Community Development has the right to launch/open projects supported under the CLÁR programme. The Department should be notified a minimum of six weeks in advance of the proposed date for such events.
-
Infrastructure Guidelines - All applications must demonstrate detailed project costings and clear value for money. The complexity of the appraisal requirements and the methods used will depend on the size and nature of the project and should be proportionate to its scale.
-
All procurement processes must be in line with EU Public Procurements Requirements (EU Directive 2014/24), national procurement and Mayo County Council procurement guidelines. Please refer to www.etenders.gov.ie and www.constructionprocurement.gov.ie for more details.
-
A checklist confirming compliance with funding conditions relating to the grant aid will be required upon project completion.
Non-Compliance with the conditions as outlined or any additional stipulations agreed during contract negotiations may result in the requirement to refund part or all of the grant aid awarded.
Please see Measure 1 scheme outline for further details. For details on all Clár measures please click here
ALL APPLICATIONS ARE TO BE SUBMITTED TO MAYO COUNTY COUNCIL ONLINE:
by 3pm Thursday 8th May 2025
CLOSING DATE WILL BE STRICTLY ADHERED TO
If you have any queries, please email the Community Section at community@mayococo.ie or call 094 – 906 4660
|